Home › Areas
Across Harris County and the Houston area
The same clay, heat and rain cover the whole region, but the age of the homes and the lay of the land change from one side of town to the other.
A driveway poured forty years ago in an east side neighborhood and one poured last year in a northwest subdivision face the same soil and the same storms. What differs is how much movement the slab has already been through, how the lot drains, how close the big trees are, and what was done to the ground before the concrete went down.
The four pages below each look at one part of the area and what it tends to mean for concrete and asphalt there.
Concrete and asphalt paving in Pasadena, where older slabs meet heavy traffic
Pasadena sits on the east side of Harris County, close to the Ship Channel, and a lot of its pavement has been in the ground for a long time. Many driveways in the established neighborhoods were poured decades ago, and many commercial yards carry trucks every working day. That combination means most paving questions here are about old concrete, tired asphalt and ground that barely slopes, rather than about a blank lot and a fresh start.
Driveways, extensions and patios in Cypress subdivisions
Cypress, in northwest Harris County, is mostly newer master-planned subdivisions, and the paving work there follows a pattern. A family moves into a house with the driveway the builder poured, lives with it for a few years, then wants it wider, wants a patio out back or wants to fix the first cracks. The ground is young and still settling, the HOA usually has opinions, and the lots were graded to drain as a system. All of that shapes a good project.
Driveway paving in Spring, under the trees and on mixed soils
Spring lies north of the city, and its neighborhoods range from older wooded streets where tall pines and oaks shade the whole yard to newer sections where the trees are still saplings. The trees are a big part of why driveways here fail the way they do. Roots lift slabs, shade keeps surfaces damp, and the soil can change from sandy to sticky clay within a short distance. Good paving work in Spring starts by reading the lot, not just the pavement.
Paving on the flat former prairie around Katy
Katy grew fast on the west side of the Houston area, and much of that growth landed on land that was open prairie and rice farmland not long ago. That ground is remarkably flat and holds water, the soil is largely clay, and the development ranges from big subdivisions with generous lots to large commercial centers. Paving here is mostly a question of slope, base and scale.
Across all of it, the questions worth asking stay the same: how the lot drains after a heavy storm, what the ground under the old slab was like, and whether the damage came from the surface or from below.
These pages describe the region rather than draw a boundary around it. A home or business in Pearland, Humble, Baytown, Tomball or anywhere else nearby deals with the same ground and weather, so the lack of a dedicated page means nothing in particular. Say where the property is and what the job is, and the conversation starts there.
Talk through your site
Start with the address, what you want done, and a few photographs of the area, including anywhere water sits after a heavy rain.